Commercial Demolition and Strip-Outs in Geelong

Commercial demolition in the Geelong region ranges from returning a shop or office to base build at the end of a lease, through to removing industrial sheds and hardstand on larger sites. These jobs bring more stakeholders than a house: landlords, tenants, building managers, neighbouring businesses and the public walking past. Planning, documentation and staging matter as much as the demolition itself.

Geelong Demolition Service is a referral service. With your consent, we pass your enquiry to one independent demolition business holding the Victorian registration your project requires. We do not quote, manage or carry out the work.

Typical commercial scopes

  • Tenancy make-good: partitions, ceilings, floor coverings, joinery and services removed to return a lease to its base condition.
  • Retail and hospitality strip-outs ahead of a refit.
  • Office strip-outs in multi-storey buildings, often after hours.
  • Industrial demolition: workshops, warehouses and steel-framed sheds, frequently with concrete hardstand.
  • Partial or facade-retention work where part of a building must stay.
  • Make-safe and removal after fire or storm damage.

Registration and approvals

The Victorian Building Authority registers demolishers by class, and the class needed depends on the size and type of the building. Ask each contractor which class they hold and check it on the VBA's public register. Most commercial demolition requires a building permit from a registered building surveyor, and section 29A report and consent from council where the volume or street-facade tests are met. Where work affects the footpath or public areas, council may require protection-of-the-public consent and hoarding. In central Geelong and other areas with planning controls, check whether a planning permit is required before scheduling.

Hazardous materials

Commercial buildings constructed before 2003 should have an asbestos register. Review it before a strip-out, and commission a destructive survey before demolition where materials are hidden. Licensed asbestos removal is required for larger quantities and for any friable material. Other materials can need attention too, such as synthetic mineral fibre insulation, lead paint, old fluorescent fittings and stored chemicals. See asbestos before demolition.

Staging and documentation

Expect a commercial demolisher to provide or work under:

  • a safe work method statement for high-risk work
  • a demolition plan showing sequence, exclusion zones and plant
  • service isolation records and permits to work where a building manager requires them
  • waste tracking, including recycling and disposal dockets
  • a handover record for the landlord or principal contractor

Working around tenants and the public

Strip-outs often happen while neighbouring tenancies trade. Noise windows, dust screens, protected access routes and after-hours work are common requirements. Building managers may need inductions and certificates of currency before any contractor can start.

What drives price

  • Floor area and how much is removed (ceilings, services, slab)
  • After-hours or staged work
  • Asbestos and other hazardous materials
  • Access, lifts, loading docks and crane needs
  • Disposal volumes and recycling rates
  • Documentation and site management requirements

Published ranges for commercial work vary too widely to be useful. Quotes should follow a site inspection and a written scope.

Make-good obligations

A make-good clause in a lease decides what must be removed and what condition the premises must be left in. Read the lease, and the landlord's base-build specification if there is one, before requesting quotes, so every contractor prices the same scope.

Before the quote visit

Have the lease make-good clause, floor plans, the asbestos register, building manager contacts and access times ready. Note any items the landlord wants left in place.

Industrial and larger sites

Industrial sites can include large spans, hardstand, underground tanks or pits, and services that run between buildings. Mention any known history of fuel storage or chemicals, as this may bring in specialist assessment before demolition or excavation.

Frequently asked questions

Which VBA registration does a commercial demolisher need?

It depends on the building's size and height. Ask the contractor to state their demolisher class and confirm it on the VBA register.

Do we need an asbestos survey before a strip-out?

Check the asbestos register first. Where materials will be disturbed and their status is unknown, a survey before work starts is the safe course.

Can demolition happen while neighbouring tenancies trade?

Often, with staging, screens, noise windows and agreed access. Building management will usually set conditions.

Is a planning permit needed?

It depends on the planning controls over the site. Ask council or a planner before booking work, especially for any change visible from the street.

Who disconnects services?

Licensed trades and the relevant service authorities, coordinated with the building manager where one exists.

Next step

Send the address, floor area, lease end date and any make-good requirements. With your consent, we will refer the project to a registered demolisher working in the Geelong region. Request a referral.

Tell us about your demolition job

Free, no-obligation enquiry. Include your suburb, what needs removing and photos if you can.

Prefer to talk? Call 0480 006 876.

This form sends your project enquiry to Geelong Demolition Service at [email protected]. If you tick the consent box, your enquiry will also be shared with our independent service partner once one is appointed, so they can contact you. Please don't include sensitive personal information.